Builder & Model Home Installation Prep: 10 Steps to Keep Your Project on Track

  • easter59
  • Jun 25
  • 1 min read
ree

Polished Homes Need Precision Installs

Model homes are high-impact spaces—and tight timelines are the norm. At Caudelle, we specialize in coordinating with builders and designers to install furniture, rugs, and artwork quickly, efficiently, and without cutting corners.

Model Home Installation Prep Checklist

Before Scheduling:

  • Confirm your construction is fully complete (including flooring, electrical, and HVAC)

  • Schedule final touch-ups and walk-throughs before furniture arrives

Installation Day Prep:

  • Clear the space of debris and construction tools

  • Ensure utilities (electricity, lighting, HVAC) are active

  • Provide final floor plans, staging guides, or visual references

  • Reserve loading dock or provide direct parking access

  • Share gate codes, access keys, or escort details

Final Review:

  • Designate a point of contact for installation supervision

  • Walk through placement and confirm satisfaction before sign-off

  • Identify any adjustments or follow-up needs on-site


Tip for Builders:

Plan your art and mirror installation after all painting and lighting is complete—this avoids rework and wall damage.

 
 
 

1 Comment


Eron Finch
Eron Finch
Oct 08

That’s a solid guide on managing installation prep efficiently. Having a reliable team really makes the difference when coordinating multiple contractors and deadlines. Partnering with experienced professionals like Patron Career Staffing can help ensure projects stay on schedule by connecting builders with qualified workers who understand the pace and precision construction demands.

Like

Contact

(404) 355-6878

Join our mailing list

©2019 by Caudelle Interior Installations. Proudly created with Wix.com

bottom of page