top of page

Residential Installation Day Checklist: How to Prepare Your Home for White Glove Service

  • easter59
  • Jun 23
  • 1 min read

Getting Ready for White Glove Service

Installation day should feel like the exciting final step in your design journey—not a source of stress. At Caudelle Interior Installations, our goal is to make the process smooth, professional, and drama-free. Use the checklist below to make sure your home is fully prepared for a seamless experience.


Residential Installation Checklist

Before We Arrive:

  • Confirm your installation date and time with your Caudelle coordinator

  • Make sure all items have been received and checked for damage

  • Clear walkways, stairwells, and installation zones of boxes, rugs, or fragile items

  • Notify us of any delicate surfaces needing extra care (e.g., plaster, wallpaper, high-polish floors)

  • Share your floor plan or furniture layout with our crew, if available

  • Secure any pets and remove potential hazards

Building Access & Logistics:

  • Arrange for elevator access or building entry (codes, keys, concierge)

  • Reserve a parking/loading zone if needed

  • Provide any access instructions prior to arrival

During the Installation:

  • Ensure a decision-maker is onsite for placement guidance

  • Review final placement with our lead installer before we wrap up

  • Walk through the space to confirm satisfaction before sign-off

Pro-tip: Freshly painted walls? Allow at least 24 hours to cure before hanging art or mirrors to avoid damage.

 
 
 

Comments


Contact

(404) 355-6878

©2019 by Caudelle Interior Installations. Proudly created with Wix.com

bottom of page